I’ve been spending a lot of time working on downtown York, which believe me, EATS time. However, I took a few minutes to finish ballasting Black Bridge. Here are a pair of photos.

SD40-2s-on-bridge

SD40-2s-on-Bridge-Higher 2018-01-22-12.46.48

 

2018-01-21-15.44.51 2018-01-21-15.24.11