I made up two batches of trees and finished the ground cover on the remaining unfinished portion of the layout. This, of course, warranted photos.

This is an overview of the area showing the overall arrangement.

Overview of New Work Jul-29-2007 A week before construction started: Jul-29-2007 Finished area between the tracks. Top down view of the bridge under construction My GP10 leads a short local around the curve, over the bridge 5863 Rolls over the newly installed bridge My GP10 Approaching the Bridge My GP10, 5863, Leading a short local Jul-29-2007-GP10-Front-Embankment